Basic Info.
Packaging & Delivery
Product Description
>>> Product Description
SC797 double pole 15(3)A 250V red green on-off on-on coffee machine rocker switch
Electrical Rating | 15A 125VAC,15(3)A 250VAC T125/55 |
Contact Resistance | <=20mΩ |
Insulation Resistance | >100mΩ |
Electric life | 10000circles |
Mechanical life | 50000circles |
Temperature Range | 0°C....+85°C |
Flammablility | UL94V-0 |
Certification | UL/ENEC/SMEKO/VDE/CQC/CB/RoHS/REACH |
>>> Product show
>>> Certificate
Most of our products have passed safety certifications as UL,VDE,SEMKO,TUV, CQC, CE,CB and the material is RoHS and REACH standard.
>>> Application
>>> Packing & Delivery
Packing Details : poly bags /carton; inner boxes/ cartonDelivery Details : by sea, by air, by UPS, DHL, FEDEX, up to customer request.
>>> Company Profile
>>> Exhibition
>>> Advantage
1.Technical support
We have strong technological capacity, complete production testing equipment and a perfect mold processing center,the automation equipment have covered 80% of all production line,micro switches have been automated whole process of assembly and inspection
3.Rich experience
More than 30 years manufacturing experiences.
5.Free Sample
>>> FAQ
Q: When can we get the reply?
A: Any inquiries will be replied within 24 hours.Our Sales Team will try our best to support you
A:OEM/ODM Accept.
Specialized in this line for 30 years.
sample order can be accepted.
Factory supply directly, cheap price quality assurance.
Professional after -sale service.
A: We are factory.
Q: How long is your delivery time?
A: Generally it is 5-10 days if the goods are in stock. or it is 20-25 days if the goods are not in stock, it is according to
quantity.
Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q: What about Minimum order quantity ?
A: Generally Our MOQ for electric switches is 1000pcs, you can place a trial order at first without limit for MOQ.
A: Yes,We provide OEM service and can customize products according to drawing.
A: We strictly control every detail of production, and every product is inspected by our QC team before delivery, moreover, our production have got CQC, UL, VDE, DERKA(KEMA),SEMKO,ENEC,CB,TUV certification.
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us or send inquiry to us.